A gabled Eichler house with a low-slope roof, clerestory glass and a two-car garage on Fairglen Drive in San Jose.

Home › Guides › Reroof checklist

Eichler roof replacement checklist

Short answerBefore tear-off, settle your climate zone and fire zone, any Eichler design rules, the roof system and insulation level, and the work that needs the open roof: wiring, skylights, AC lines and solar. Then confirm the permit, the contract scope and how hidden wood damage will be priced.

Every roofer we work with is licensed and insured.

Updated · Sources reviewed November 17, 2026 · By Eichler Roof Replacement

  • Active C-39 roofing license, checked on CSLB
  • Contractor's bond and workers' comp on file
  • Low-slope systems: foam, built-up, modified bitumen, single-ply
  • Free written estimate, no obligation

Before you get quotes

  • [ ] Find your climate zone. It decides whether you need a cool roof and R-14. Climate zones.
  • [ ] Check your fire hazard zone. Very High zones require Class A on most reroofs. Fire zones.
  • [ ] Check city or county Eichler rules and historic district status. Permits and design rules.
  • [ ] Know your roof: system, age, repairs, warranty and insulation, the questions the Eichler Network suggests owners answer first (Lost in the Dark No More).

Decisions while you compare quotes

  • [ ] Roof system: foam, single-ply or built-up. Compare.
  • [ ] Insulation R-value and how high the edge will rise. Insulation.
  • [ ] Tear-off or overlay. Guide.
  • [ ] Skylights: replace now or keep. Skylights.
  • [ ] Wiring upgrades while the deck is open. Wiring.
  • [ ] AC line sets and condensers. Radiant heat and AC.
  • [ ] Solar removal and reinstall, or new solar. Solar.
  • [ ] Drainage fixes. Drainage.
  • [ ] Asbestos sampling for older roofing, if your roofer or consultant recommends it. Asbestos.

The contract

  • [ ] License checked on the CSLB site. Choosing a roofer.
  • [ ] Scope lists system, insulation R-value, cool roof rating, edge metal, drains and skylights.
  • [ ] Unit price for rotted fascia, beam ends and decking.
  • [ ] Who pulls the permit and files the Energy Code forms.
  • [ ] Written warranties from the maker and the installer.
  • [ ] Overspray and site protection plan for foam jobs (Roofing Survival Guide).

During the job

  • [ ] Walk the open deck with the roofer if they find damage.
  • [ ] Electrician and HVAC work done and inspected before insulation goes on.
  • [ ] Photos of the deck, insulation and flashing before they're covered.

After

  • [ ] Final inspection signed off.
  • [ ] Warranty documents, cool roof product ratings and permit card filed with your house papers.
  • [ ] Recoat date on the calendar if it's a foam roof. Recoating.

Every roofer we work with is licensed and insured.

Book a free roof inspection

Sources

Sources reviewed November 17, 2026. Confirm permits, design rules and requirements with your contractor and your city or county. This page is general information, not legal or insurance advice.

CallBook inspection